Dredging works at the port of Lagos, Nigeria.
Period:
2010 — 2021
Project volume:
53 300 000 m3
Dredging works for eliminating of storm sediment accumulating in the channels and water area of the Port of Liepaja.
Period:
2008 — 2021
Project volume:
1 663 100 m3
Maintenance dredging works at the approach channel of the Port of Constanta.
Period:
2019
Project volume:
139 500 m3
Delivery of sand from underwater pits and unloading by pumping ashore to the coastal zone of the Ameland and Vieland Islands.
Period:
2017 — January, 2018
Project volume:
1 770 000 m3
Maintenance dredging works at the approach channel of the Port of Midia.
Period:
2017
Project volume:
65 000 m3
Maintenance dredging works at the approach channel of the Port of Poti.
Period:
December, 2016 — February, 2017
Project volume:
350 000 m3
Maintenance dredging works of the object “Klaipeda State Seaport waters’ territory from PK 17 to PK 110A”.
Period:
2016 — March, 2018
Project volume:
1 080 000 m3
Dredging works on elimination of storm threat of sediments on the ship’s channel of the Port of Ventspils.
Period:
december 2015
Project volume:
70 000 m3
Dredging works according to the project "Reconstruction of approach channels and water areas of the Port of Liepaja".
Period:
june 2015
Project volume:
65 000 m3
Development of infrastructure of Krievu island for the relocation of the port activities from the centre of Riga, Latvia.
Period:
2013 — 2014
Project volume:
2 800 000 m3
Dredging of the approach channel to the port of Malabo.
Period:
2009 — 2011
Project volume:
2 000 000 m3
Dredging of the approach channel.
Period:
Year 2010
Project volume:
980 000 m3
Soil replenishment and land nourishment in port of Viareggio.
Period:
Year 2010
Project volume:
245 000 m3
In cooperation with Dutch company "Boscalis" were performed dredging
works in the port water area and backfilling of the wharf.
Period:
Year 2009
Project volume:
395 000 m3
Sand mining and backfilling of the caissons.
Period:
Year 2009
Project volume:
92 000 m3
Dredging of the sand with refilling it to the beachfront.
Period:
Year 2008
Project volume:
330 000 m3
Dredging of the Approach channel and the water area of the Port of Duala.
Period:
2008 — 2009
Project volume:
5 000 000 m3
Dredging of the approach channel and the water area of the Port of
Alexandroupolis.
Period:
2008
Project volume:
400 000 m3
Project: Dredging works for eliminating of storm sediment accumulating in the channels and water area of the Port of Liepaja.
Type of works: Maintenance dredging works.
Client: Administration of Liepaja's Special Free Economic Zone.
Year: 1999 — 2007
Project volume: 1 463 000m3
Project:
Quay construction.
Type of works: Dredging of the sand and refilling it into the body of the quay under construction.
Client: Port of Cadiz Authorities.
Year: 2007
Project volume:
260 000m3
Project: Dredging of the sand and refilling it into the body of queue.
Type of works: Capital dredging works for port reconstruction.
Client: Authority of the Port of Dakar.
Year: 2007
Project volume: 250 000m3
Project: Quay construction.
Type of works: Dredging of the sand and refilling it into the body of the quay under construction.
Client: Port of Algeciras Authorities.
Year: 2007
Project volume: 114 000m3
Project: Dredging works on the mortar sand mining with refilling it into the concrete caissons of the wharf wall.
Type of works: Capital dredging works on the port reconstruction.
Client: Port of Rosario Authorities.
Year: 2007
Project volume: 10 000m3
Project: Dredging works. Optimization of capacity and effectiveness of the existing Ventspils Free Port infrastructure.
Type of works: Capital dredging on the reconstruction of the Approach channel of the Ventspils Free Port.
Client: Ventspils Free Port Authority.
Year: 2006 - 2007
Project volume: 116 000m3
Project: Dredging of the approach channel. Reconstruction of the ship's log Riga porta. Northern waters. Rinuzhi berth ZO-18.
Type of works: Capital dredging for the port reconstruction.
Client: Riga Fee Port administration.
Year: 2006
Project volume: 200 000m3
Dredging works on the defense of Venice port.
Year: 2004 — 2006
Project volume: 1 100 000m3
Project: Extraordinary Dredging works on the Approach channel of the Ventspils Free Port.
The works were performed in the adverse weather conditions, caused by the vast storm. the navigation depths on the channel were restored within the shortest possible period of time.
Type of works: Maintenance dredging.
Client: Ventspils Free Port Authority.
Year: 2005
Project volume: 525 000m3
Project: Maintenance dredging.
Year: 2005
Project volume: 440 000m3
Project: Commissioned by the regional authorities works to protect beaches from erosion have been performed.
Year: 2005
Project volume: 600 000m3
Project: Reconstruction of the Approach channel and Port water area in the zone of quays 50-51.
to reach the project depths on the location of outcrop of granitic rock, the method of underwater blast with the participation of the divers was used.
Type of works: Capital dredging works on the port reconstruction.
Client: Administration of Liepaja's Special Free Economic Zone.
Year: 2004
Project volume: 350 000m3
Dredging works for container terminal construction.
Year: 2004
Project volume: 300 000m3
Dredging works of the approach channel.
Year: 2004
Project volume: 450 000m3
Dredging to create a protective breakwater to discharge of sand to shore via hydraulic-fill pipeline.
Year: 2003
Project volume: 170 000m3
Dredging in the harbor waters and approach channel of port Monfalcone and discharging of soil ashore via hydraulic-fill pipeline.
Year: 2003
Project volume: 756 000m3
Project: Reconstruction of the port water area.
Maintenance dredging works on the channel and port water area.
Capital dredging works till – 14m on the Approach channel and the Northern part of the water area of the Port of Klaipeda.
Dredging works in the water area of the Port of Klaipeda near the queues N80-N115 till the designed depth – 12.5m.
In the course of performance of Dredging works in the water area of the Port of Klaipeda, a huge amount of massive boulders, remained from the ice advance, were detected. Some of the
boulders were more then 10 tones gross.
The wide scale hydrographical and diving surveys on the detection and lifting the massive boulders, obstructing the qualitative dredging, were carried out by the specialists of our Company.
Type of works: Capital dredging works on the port reconstruction.
Client: Administration of the State Commercial Seaport of Klaipeda.
Year: 1997 - 2003
Project volume: 3 290 000m3
Project: Dredging of the Approach channel and the water area.
Type of works: Maintenance dredging works.
Client: Authority of the Port of Alexandria.
General contractor: HUTA-SETE (Marine Works Ltd).
Year: 2002
Project volume: 615 000m3
Project: Dredging of the sand and refilling it to develop the territory of Container terminal.
Dredging of the sand and refilling it on the beach Playa la Pineda.
Type of works: Capital dredging works on the port reconstruction.
Capital dredging works on the port reconstruction with discharging of the material ashore through the floating pipeline.
Client: Port of Barcelona Authorities.
Port of Tarragona Authorities.
General contractor: REMOCIONES MARITIMOS S.L.
Year: 2002
Project volume: 135 000m3
Project: Dredging of the approach channel.
Year: 2001
Project volume: 650 000m3
Project: Dredging of the Approach channel and port water area.
Type of works: Maintenance dredging works.
Client: Authority of the Port of Sohar.
General contractor: HYUNDAI (Engineering & Construction Co.Ltd)
Subcontractor: Dragomar S.P.A.
Year: 2000 - 2001
Project volume: 1 150 000m3
Project: Sand extraction for creating the territory of Changi Airport.
Type of works: Capital dredging works for creating the territory of Changi Airport.
Client: Government of Singapore.
Year: 1999 - 2000
Project volume: 3 200 000m3
Project: Reconstruction of the Port of Ventspils.
Dredging and widening of the Approach to the Ventspils Oil terminal
The Dredging works on the widening and deepening of the Approach channel, performed in the scope of reconstruction of the Port of Ventspils, have provided the navigation of the large capacity tankers with draught about 100 000 tons.
Type of works: Capital dredging works under the port reconstruction.
Client: Ventspils Free Port Authority.
Year: 1996 - 1999
Project volume: 3 000 000m3
Project: Reconstruction of the Approach channel of the Sarkandaugava range.
Reconstruction of the Approach channel of the Rinuzhi range.
Reconstruction of the Quay MKR-1.
Type of works: Capital dredging works on the port reconstruction.
Client: Administration of the Riga Free Port.
Year: 1997- 1999
Project volume: 1 700 000m3
Project: Dredging of the water area of the Ports of Tallinn, Muuga and Rohukula.
Type of works: Maintenance dredging works.
Client: National Hydrograph of Estonia.
Year: 1997-1998
Project volume: 1 400 000m3